Posted on

If you missed us, Schedule a time to discuss the 2018 IEEE PES General Meeting August 5th-9th in Portland, OR

Margaret Goodrich, T-Nexus Integration Lead (Project Consultants President) and Chuck DuBose, Principal Engineer, P.E. will be attending the PES General Meeting in Portland, Oregon from August 5-9, 2018.

Re-imagining the Electric Grid

We will also be hosting two CIM Meetings during the IEEE PES 2018 General Meeting!

The first is the CIM TF Meeting:  
AMPSCAMC03 – CAMS TF on Power System Modeling in CIM

Committee Meeting
(AMPS) Computer Analytical Methods
Monday, August 6, 2018
11:00 AM – 12:00 PM
DP-Washington

Session Chair 1: Margaret Goodrich

Presentations by David Bogen of Oncor and Pat Brown of EPRI   — Margaret Goodrich will present a status report on the CIM and the IEEE Task Force


The second meeting is the CIM TF Panel Session:  
AMPSCAMPL03 – Centralized Network Model Management Integration Using the CIM Standards

Panel Session
(AMPS) Computer Analytical Methods
Thursday, August 9, 2018
8:00 AM – 10:00 AM
OC-D139

Session Chair 1: Margaret Goodrich

Presentation Information

Start Time End Time Submission Number Submission Title Authors
8:00 AM 8:10 AM 18PESGM2628 Federated Architecture for DER Gerald Gray;
[email protected]
(Main Author)
8:10 AM 8:20 AM 18PESGM2629 Using Blockchains & CIM for Distributed Network Model Management Alan McMorran;
[email protected]
(Main Author)
8:20 AM 8:30 AM 18PESGM2631 Managing Smart Metering Within a Smart Cities Context David Bishop;
[email protected]
(Main Author)
8:30 AM 8:40 AM 18PESGM3029 GridAPPS-D – leveraging the CIM for development of portable distribution system applications Ron Melton;
[email protected]
(Main Author)
Posted on

Presented T-Nexus (AEP’s New NMMS) at NATF Meeting in Denver on May 15th

Margaret Goodrich, T-Nexus Integration Lead (Project Consultants President) and Sutton Sutherin, T-Nexus Project Manager (American Electric Power) presented T-Nexus – AEP’s Network Model Management Solution at the North American Transmission Forum meeting.

T-Nexus Purpose

  • Revise network model management in the AEP Operations, Planning, Protection and Asset Management domains with the intent of gaining qualitative benefits across all AEP Transmission footprints

T-Nexus Goals

  • Unify modeling processes across the AEP Transmission footprints
  • Reduce manual effort of mapping between applications
  • Improve data governance
  • Implement clear information flow throughout AEP Transmission organization
  • Enable data analytics